“We’ve been extremely pleased
with J-J Hooks ... The ... barriers are not a male-female system like some
of the others ... more versatility is built in which often allows less
planning and less labor during traffic switches to ensure the barrier is
configured correctly ... some of the other positive connection barrier
systems bind up during placement and removal often causing damage to the
wall - the J-J Hooks system seldom does.”
Ryan Gorman, P.E., Sr. Project Manager
Corman Construction, Inc. |
|
“We’re extremely happy with road
barriers that have the J-J Hooks connection. .. They are much quicker and
easier to work with ... there is no reason for our guys to have their hands
and fingers in the way since there is no loose hardware to put in place ...
Overall, we’re
very impressed with the way this project is going with the use of J-J Hooks
road barriers.”
Joe Steven, Superintendent
Ajax Paving Company |
|
|
“... we installed over 26,000 linear feet
of temporary barrier wall in 20’ sections ... in six shifts ... removal
was simplified by not having to pull pins or shake walls loose.”
Don Stegemoller, Chief Estimator
Shappert Engineering Company |
|
|
“... with only a loader and a ground man
to align sections, we were able to off-load and set 40 barrier units per hour.
This is a very slick system... You have a winner with this design”
Paul Wiezorek, Superintendent
Lanzo Construction Company |
|